Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
How Much Does Cabinet Installation Cost in Fort Lauderdale?
Cabinet installation in Fort Lauderdale typically costs between $4,000 and $13,000 for a full kitchen, depending on cabinet material, layout complexity, and whether old units need to come out first. Most Fort Lauderdale homeowners land somewhere in the $6,000-$9,500 range for a standard kitchen with semi-custom cabinetry and basic modifications. That number is on the page so you can screenshot it, compare it to other quotes, and walk into any conversation with a baseline.
For a full picture of what a cabinet project fits into, see our Cabinet Installation in Fort Lauderdale service page, or visit our home page to see all seven trades we cover.
Key Takeaways
- Typical range: $4,000-$13,000 for full kitchen cabinet installation in Fort Lauderdale
- Mid-range most common: $6,000-$9,500 for semi-custom cabinets in a standard kitchen layout
- Stock cabinets keep costs at the low end; custom millwork pushes past $13,000
- Humidity and coastal air in Fort Lauderdale matter for material choice – plywood boxes hold up better than particleboard here
- Permit requirements in Broward County apply when cabinet work involves moving plumbing or electrical – budget $150-$400 for permits if that applies
- Written price before any work starts – always. That is Clause 1 of the Haven Standard, not a marketing line
Cabinet Installation Cost Breakdown (2026)

The table below reflects actual Fort Lauderdale market pricing for 2026. Labor rates in Broward County run slightly higher than national averages due to the cost of living and licensing requirements under Florida state law. These are the numbers Rowan Construction Group uses when building written quotes – not rounded estimates inflated to leave room for negotiation.
| Scope of Work | Typical Fort Lauderdale Price Range |
|---|---|
| Stock cabinets, small kitchen (under 100 sq ft) | $4,000 - $5,800 |
| Semi-custom cabinets, standard kitchen (100-150 sq ft) | $6,000 - $9,500 |
| Semi-custom cabinets, larger kitchen (150-200 sq ft) | $8,500 - $11,500 |
| Custom or full-overlay cabinets, any size kitchen | $10,000 - $13,000+ |
| Cabinet removal and disposal (existing units) | $400 - $900 |
| Soft-close hardware upgrade | $200 - $600 |
| Crown molding and finish trim | $300 - $800 |
| Interior cabinet lighting (LED strip, pre-wired) | $250 - $700 |
| Broward County permit (if plumbing/electrical affected) | $150 - $400 |
What Pushes the Price Up
Material grade is the biggest single variable. Stock cabinets from a box retailer can come in under $2,000 in materials for a small kitchen, but the labor to install them correctly – level runs, shimming for Fort Lauderdale’s older homes with out-of-plumb walls, scribing to irregular soffits – adds up the same way it does for higher-end product. KraftMaid and Wellborn cabinets, both of which Rowan sources regularly, are semi-custom lines that give you more finish options and better box construction than stock, typically adding $1,500-$3,500 to the materials total but meaningfully extending cabinet life in a coastal humidity environment.
Custom millwork sits at another level. A Fort Lauderdale homeowner in Victoria Park or Harbor Beach asking for floor-to-ceiling inset cabinetry with a painted finish and integrated organizational inserts is looking at $12,000-$18,000+ for materials and labor combined. That is not overpriced – it is a different product category.
What Keeps the Price Down
Keeping the existing layout – meaning no relocation of the sink, dishwasher, or range – saves real money. The moment a drain line or electrical circuit moves, Broward County requires a permit and a licensed sub-trade to do the work, adding cost and time. If the wall condition is good and the floor is level, a straight cabinet swap on the same footprint is the most cost-efficient cabinet project available. Semi-custom in a standard layout, no demo surprises, is where most Fort Lauderdale jobs finish in the $6,000-$7,500 range.
Before
AfterWhat Affects Cabinet Installation Pricing in Fort Lauderdale
- Cabinet grade and construction. Particleboard-box cabinets cost less upfront but absorb moisture in Fort Lauderdale’s climate – especially in kitchens that run the AC hard and still see high ambient humidity through summer. Plywood-box construction, standard in the KraftMaid and Wellborn lines Rowan specifies, costs more but is the right call for a home that will sit in a coastal Florida market for another 15 years. The price difference between a particleboard box and a plywood box at the semi-custom level is roughly $800-$2,000 on a typical kitchen.
- Kitchen size and linear footage. Cabinet pricing is largely driven by how many linear feet of uppers and lowers the crew is installing. Fort Lauderdale’s mid-century ranch homes in neighborhoods like Progresso Village and Sailboat Bend often have smaller, galley-style kitchens – 12-18 linear feet – while newer builds in Coral Ridge or Poinciana Park may run 22-30 feet with an island. Every additional linear foot adds $150-$350 in combined materials and labor.
- Existing cabinet removal and wall condition. Older Fort Lauderdale homes built in the 1950s and 1960s frequently have tile or plaster walls behind existing cabinets. When that material is disturbed during demo, it needs to be patched correctly before new boxes go up. Rowan documents the wall condition with photos before and after demo so the customer knows exactly what was found – not a verbal description, a photo record.
- Door style and finish. A shaker door in a painted finish is one price. A five-piece raised-panel door in a glazed finish is another. Inset doors – where the door sits flush inside the frame rather than overlapping it – require tighter tolerances and more installation time, adding $500-$1,200 to labor on a standard kitchen.
- Hardware and accessories. Soft-close hinges and drawer slides have become the standard expectation in Fort Lauderdale’s $600,000+ housing market, and they do add cost – plan on $200-$600 depending on the number of doors and drawers. Pull-out shelves, lazy Susans, and drawer organizers each add $100-$400 per unit.
- Broward County permitting requirements. Cabinet installation alone – meaning no plumbing or electrical relocation – does not typically require a permit in Fort Lauderdale. But if the project touches a gas line, moves a circuit, or relocates the sink, Broward County Building Services requires a permit. That is not an optional step; it is a code requirement, and any contractor who tells you otherwise is putting you in a position where your homeowner’s insurance may not cover a future claim. Budget $150-$400 for the permit if it applies.
Fort Lauderdale-Specific Considerations

Fort Lauderdale’s housing stock is unusually diverse for a city its size. You have post-war CBS (concrete block structure) homes in Edgewood and Tarpon River that were built without standard 8-foot ceiling heights – sometimes 7’6″, sometimes 7’2″ – which affects how upper cabinet heights are specced and whether crown molding can run to the ceiling. Then you have newer construction in areas like Rio Vista and Colee Hammock where ceilings are 9-10 feet and full-height cabinetry is both feasible and expected by buyers.
The humidity piece deserves a direct statement: Fort Lauderdale averages around 75% relative humidity through the summer months, and kitchens in homes without consistent air conditioning are genuinely hard on cabinet boxes. We see delaminated doors and swollen drawer faces regularly on particleboard-core cabinets that are 8-12 years old in homes that run their AC seasonally. When we quote a project, we note the box material explicitly in the written scope so the customer knows what they’re getting – not a vague reference to “quality construction.”
If you’re pairing new cabinets with new countertops, the cost picture changes. Countertop installation in Fort Lauderdale typically runs $2,000-$6,500 depending on material – Cambria quartz on the higher end, laminate at the low end. Sequencing matters: cabinets are installed and leveled first, then countertop templating happens, then the countertop is fabricated and dropped in. Rushing that sequence causes expensive errors. A kitchen remodel in Fort Lauderdale that includes both cabinets and countertops typically runs $9,000-$20,000 for a small-to-mid kitchen.
How to Save on Cabinet Installation
The single most effective way to reduce cabinet installation cost in Fort Lauderdale is to keep the existing layout. Moving a sink 18 inches to center it on a new window sounds straightforward – and mechanically it is – but it requires a Broward County plumbing permit, a licensed plumber for the drain and supply relocation, and a patched countertop cutout. That one decision can add $800-$2,200 to a project that otherwise would have been a clean swap.
A few other approaches that hold up in practice:
- Choose semi-custom over custom for painted finishes. A painted shaker door in semi-custom (KraftMaid, Wellborn) is visually indistinguishable from a custom-milled door to most buyers and appraisers. The price difference is real – often $2,000-$4,000 on a full kitchen. Save custom millwork for detail work where it matters: a pantry with unusual dimensions, a built-in appliance enclosure, or a kitchen island with a non-standard depth.
- Source hardware separately. Cabinet pulls and knobs from a contractor’s standard supply run $3-$8 each. The same quality from a specialty hardware retailer or a direct import source can be $1.50-$4 each. On a kitchen with 30 doors and 15 drawers, that difference adds up. Rowan is fine with customer-supplied hardware as long as it arrives before installation day.
- Get a second opinion on any written estimate. If you have a competitor’s quote, bring it to us. Grant Rowan and the team will review it line by line at no charge – not to discredit it, but to make sure you understand what each line covers and whether the scope is complete. A quote that looks lower may not include removal, disposal, or finish trim. A quote that looks higher may include items you don’t actually want.
- Schedule outside peak season if timing is flexible. Fort Lauderdale’s construction calendar tends to compress in fall, when snowbird buyers are moving in and renovation activity spikes. If you can plan a spring or summer project, crew availability tends to be better and lead times shorter.
- Bundle trades when the scope is there. If the countertop is also due for replacement, doing cabinets and countertops in one mobilization saves on setup, protection materials, and the second round of templating logistics. The combined project cost is lower than two separate jobs scheduled months apart.
To get a flat written price for your specific kitchen – with a complete scope and a written warranty – call (754) 254-7676. There is no charge for the estimate, no obligation, and the number you get is the number the project starts at.
What You Get When Rowan Does the Work

Grant Rowan started this company in 2007 with one operating rule: put the price in writing before anyone picks up a tool. After 4,000-plus projects across Fort Lauderdale and Broward County, that rule has not changed and neither has the outcome – projects finish within a few percent of the agreed number because no change proceeds without a signed change order. Under Clause 1 of the Haven Standard, the written price is not a starting point for negotiation; it is the price.
Every cabinet installation includes a documented photo record – before demo, during installation, and after completion. The photos are delivered to the customer as a standard part of the job, not something you have to ask for. If something unexpected shows up in the wall during demo – a water stain on the sheathing, a previous repair that wasn’t done correctly, an out-of-plumb stud bay – it is photographed, shown to the customer, and addressed through a signed change order if additional work is needed. No surprises on the invoice because there are no surprises in the process.
The 365-Day Done Right Promise applies to every project: if it is not done right, Rowan makes it right. That is backed by the Haven Standard, printed on every contract, and not limited by a footnote. Crews are background-checked and in uniform. A live person answers calls 24/7. These are not selling points – they are the floor for how the work runs.
Sourcing happens across 50-plus vetted brands, which is what lets the written quote carry honest numbers. When a Fort Lauderdale homeowner asks for KraftMaid or Wellborn cabinets by name, we know the current lead times, the available door styles, and the real landed cost – which means the quote reflects reality, not a placeholder that gets revised after the order is placed.
FAQs – Cabinet Installation Cost in Fort Lauderdale
How much does cabinet installation cost in Fort Lauderdale in 2026?
Cabinet installation in Fort Lauderdale costs $4,000-$13,000 for a full kitchen, with most projects landing between $6,000 and $9,500 for semi-custom cabinetry in a standard layout. Stock cabinets in a small kitchen can come in closer to $4,000-$5,800; full-custom cabinetry in a larger kitchen pushes past $13,000. Call (754) 254-7676 for a written quote specific to your kitchen’s dimensions and material preferences.
Does cabinet installation require a permit in Fort Lauderdale?
Cabinet installation alone – no plumbing or electrical changes – does not typically require a permit from Broward County Building Services. If the project involves moving a sink, relocating a circuit, or touching a gas line, a permit is required under Florida building code, and the trades doing that work must be licensed. Budget $150-$400 for the permit if those conditions apply. Rowan pulls all required permits as part of the project; the customer never has to handle permit applications.
How long does cabinet installation take in a Fort Lauderdale kitchen?
A standard kitchen cabinet installation in Fort Lauderdale – demo of existing cabinets, installation of new uppers and lowers, and trim work – typically takes 2-4 days for a crew working a full kitchen. Larger kitchens with custom sizing or complex corner configurations may run 4-6 days. Countertop templating happens after cabinet installation is complete, which adds 5-10 business days for fabrication before the countertop drops in.
Is it cheaper to reface or replace cabinets?
Refacing – applying new door fronts and veneer to existing cabinet boxes – typically costs $1,800-$5,000 for a Fort Lauderdale kitchen and makes sense when the existing boxes are structurally sound and square. Full replacement runs $4,000-$13,000 but is the right call when boxes are damaged, out of level, or you want to change the layout. In Fort Lauderdale’s older housing stock, we frequently find that existing boxes have moisture damage or are built from particleboard that is delaminating – in those cases, refacing is not a real option and replacement costs less over a 10-year horizon than refacing deteriorated boxes.
Can I supply my own cabinets and have Rowan install them?
Yes, labor-only installation is available for customer-supplied cabinets, and the price range for labor in that case is typically $1,500-$4,000 depending on kitchen size and complexity. The written quote will specify the labor scope and the condition assumptions – if the cabinets arrive damaged or missing components, that is addressed through a signed change order before any additional work proceeds. Call (754) 254-7676 to get a written labor-only estimate once you have your cabinet specs in hand.
Does the $4,000-$13,000 range include countertops?
No. The $4,000-$13,000 range covers cabinet materials and installation only. Countertop installation in Fort Lauderdale is a separate line item, typically $2,000-$6,500 depending on material – Cambria or Caesarstone quartz at the upper end, laminate at the lower. If you’re doing both trades, Rowan can quote them together in a single written scope, which keeps the sequencing correct and eliminates the coordination cost of two separate contractors.
How Rowan Quotes a Cabinet Project

The process is straightforward. Grant Rowan or one of our project leads comes to the home, measures the kitchen, assesses wall condition and ceiling height, confirms which cabinet line and door style you want, and delivers a flat written price – usually within 48 hours. That price covers demo (if applicable), installation, finish trim, hardware installation, and cleanup. It does not include surprises, because the scope is written before anyone starts.
If something unexpected is found during demo – and in Fort Lauderdale’s older housing stock, that happens often enough that we plan for it – it is photographed, explained in plain terms, and quoted as a separate signed change order. The original price does not move without that signed document. That is not a policy Rowan invented last year; it is the administrative discipline the company was built on in 2007 and the reason projects finish within a few percent of the agreed number across 4,000-plus jobs.
If you already have a written quote from another contractor, the Free Second Opinion offer stands: bring the quote, and the team will go through it line by line at no charge. The goal is not to undercut it – the goal is to make sure you understand what is and is not included before you sign anything.
Ready to Get a Written Price?
Cabinet installation in Fort Lauderdale runs $4,000-$13,000 for a full kitchen in 2026, with most projects in the $6,000-$9,500 range for semi-custom cabinetry. The number on your written quote from Rowan Construction Group is the number the project starts and finishes at – backed by signed change orders and the 365-Day Done Right Promise.
Call (754) 254-7676 to schedule a free estimate. A live person will answer, Grant Rowan’s team will come to the home, and you’ll have a flat written price before anyone picks up a tool. No charge for the estimate, no obligation, and no “call for a quote” runaround – the price is on the page and it will be on your contract.
Pricing reflects the Fort Lauderdale market as of 2026. Rowan Construction Group Fort Lauderdale offers free estimates – call (754) 254-7676.
Written by Grant Rowan, Owner at Rowan Construction Group, serving Fort Lauderdale since 2007.
What Our Customers Say
"Solid work, decent crew, and the site was left tidy every evening."
- Pearl A."Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R.







Before
After
Before
After
Before
After